Engineering Brigade 249 under the Engineering Corps on September 30 morning officially opened the Phong Chau pontoon bridge, spanning the Hong (Red) river and connecting Lam Thao district with Tam Nong district in the northern province of Phu Tho.
Báo Nhân Dân Tiếng Anh Báo Nhân Dân Tiếng Anh 17 ngày